Case 1

PICTURES

BUILDING DATA

ENVIRONMENTAL DATA

CAUSATION

REMEDIATION

case1

case1

case1

 

 

HDB outdoor
Location Jurong West
Orientation West
Materials Concrete
Surface Moisture 26.2%
Surface Temperature 26.2°C
Stain types Black and yellow patches
Stain size 20×30 cms yellow patches
10X30 cms
black patches
Stain location Below the balcony and around the plumbing
Wind Speed 0.7 m/s
Wind Direction East-West
Ambient Temperature 29.4°C
RH 73.7%
    • Rain water trapping and water dripping
    • Cold bridging in the corner of concrete balcony that leads to surface condensation
    • Outside warm air contacts to cold surfaces aggravates surface condensation
    • Less maintenance surrounding
    • Dense vegetation surrounding the area
    • High contents of atmosphere gas acids (SO2, CO and NO2 ) = Industrial area
  • Dispose water from vegetations pots and trapped rain water every time ponding water occur
  • Reduce vegetations on the balcony.
  • Since the area is less than 3m2, cleaning up the concrete can use a simple gears, includes gloves, google and home detergent.
  • Put a proper fungicide to prevent future growth. Most of the fungicide only works effectively for 2 years; therefore, keep the area cleaning and dry is important.