Case 2
Introduction
SHAPE OF BUILDING: | Square | |
ACCESSIBILITY: | Temporary system | |
FACADE’S MATERIALS: | Glass and Aluminium | |
FREQUENCY OF CLEANING: | Once a year | |
CLEANING METHOD: | Water spray | |
CLEANING CHEMICAL USED: | Neutral chemicals |
Scaffolding
Scaffold is erected to access to the “hard to reach” area (Figure 1).
An erected scaffold at this height (Figure 2) requires a Profession Engineer to thorough inspect and certify soundness prior to use.