Case 2

Introduction

SHAPE OF BUILDING: Octagon
ACCESSIBILITY:  Permanent system (Coverage = 80%)
FACADE’S MATERIALS:  Aluminium Claddings
FREQUENCY OF CLEANING:  Once a year
CLEANING METHOD:  Water spray
CLEANING CHEMICAL USED:  Mild alkaline base

Trackless System

screen-shot-2016-10-29-at-6-58-11-pm

This system does not run on any track. It only runs on the guide rail as shown. The guide rail run along the perimeter of the building in order to cover full coverage (Figure 1).

Detailed View of Trackless System

screen-shot-2016-10-29-at-6-58-22-pm

The Bucket (Figure 2).

screen-shot-2016-10-29-at-6-58-29-pm

Building Maintenance Unit (BMU) (Figure 3).

screen-shot-2016-10-29-at-6-58-36-pm

The BMU sits on wheels, which are laid on the guide rails for horizontal movement (Figure 4).