Case 6
Introduction
SHAPE OF BUILDING: | NA | |
ACCESSIBILITY: | Permanent system (Coverage = 100%) | |
FACADE’S MATERIALS: | Granite and Glass | |
FREQUENCY OF CLEANING: | Once in 1- 5 years | |
CLEANING METHOD: | Water spray and chemical | |
CLEANING CHEMICAL USED: | Neutral and alkaline base |
Track System
The track system on congested roof (Figure 1).
Detailed View of Track System
Roller is attached to the bucket to prevent accidental damage (Figure 2).
The bucket (Figure 3).
The track (Figure 4).
Lowering of the bucket for cleaning (Figure 5).