Case 5

Introduction

SHAPE OF BUILDING: Square
ACCESSIBILITY:  Permanent system (Coverage = 100%)
FACADE’S MATERIALS:  Aluminium cladding
FREQUENCY OF CLEANING:  Once a year
CLEANING METHOD:  Water spray
CLEANING CHEMICAL USED:  Mild alkaline base

Track System

screen-shot-2016-10-29-at-7-10-46-pm

The track system (Figure 1).

Detailed View of Track System

screen-shot-2016-10-29-at-7-10-52-pm

The track (Figure 2).

screen-shot-2016-10-29-at-7-10-58-pm

The bucket (Figure 3).

screen-shot-2016-10-29-at-7-11-04-pm

The rope (Figure 4).

screen-shot-2016-10-29-at-7-11-11-pm

Rollers to prevent accidental damage to the facade (Figure 5).