Use of a paint system, which allows moisture to pass through the coating to reduce the moisture pressure is another alternative to minimize paint defects caused by moisture [1-7].

Construction

Prior to the application or re-application of paint system, surface condition should be checked. Surface condition for painting process should be as follows[7-9]:

  • For new plaster, the plaster surface should be allowed about 30 days for proper curing and the reduction of moisture content. Further, it will need to be primed. The type of primer used will depend upon the final decoration required. If you plan to use oil-based paint, an alkaline-resisting primer should be used. For water-based paints, a diluted first coat can be used to prime.
  • For old surface, the preparation required will depend upon the condition of the surface. If it is clean, dry, and sound it will require no special preparation. However, if the surface is powdery or there is other evidence of old distemper residue, it should be dusted off and sealed with a stabilizing solution.
  • For the painted surfaces, the existing paintwork should be washed down first. This is necessary to remove traces of dirt and grease, which would otherwise cause failure of subsequent decoration.
fig_cleanimperfections
Figure 1
fig_removeim
Figure 2
fig_testmoisture
Figure 3

Light sanding with fine-grade, preferably part-worn, sandpaper would be able to remove ‘nibs’ and adherent dust particles, and to assist adhesion or provide a smooth level surface (Figure 1). Remove all loose and foreign particles by manual cleaning with scraping for painted surfaces (Figure 2).

Check the moisture of the substrate(Figure 3). The moisture content should not be more than 6%.

Quality Control

Quality assurance can be carried out as below:

STAGES OF WORKCHECKCRITERIA
Recognition of environmental conditionsTemperature of siteAmbient temperature > 5 °C or refer to manufacturer’s recommendations
Substrate temperatureSurface temperature of substrate < 60 °C or refer to manufacturer’s recommendationsSurface temperature of substrate > 3 °C + ambient temperature or refer to manufacturer’s recommendations
Relative humidityRefer to manufacturer’s recommendations
Checking of Surface PreparationMethod of surface preparationComply to approved submission
Prepared surfaceFree from foreign and unstable matters such as dust, dirt, rust, cement, spatter, salt, grease and oil
Mixing of paintMixing ratioComply to specificationSufficient stirring until uniformity
Painting controlSurface just before paintingPainting should start preferably within 24 hours after preparation
Protection to elements not to be coatedMask or cover those elements not to be coated
Process of applicationComply to approved submission
Intervals between coatsRefer to manufacturer’s recommendations
Wet film thicknessRefer to manufacturer’s recommendations

Source: BCA (2001b) Good Industry Practice-Painting