Jointing Materials

Navigation

Maintenance and Cleaning

Description

Mortar

Maintenance and Cleaning
Premixed Mortar

Ready mixed lime: sand for mortar

For gauging with cement should conform to BS 4721

For exposed mortar: maintenance and cleaning refer to facing bricks.
Retarded ready to used mortar

Ready to use retarded cement: lime: sand and cement: sand mortar should conform to BS 4721

Dry pre-packed cementitious mortar mixes

Dry prepacked cementitious mortar mixes should conform to BS 5838-2

Mixed on site Mortar

With material conform to BS 5628-3: 2001 clause 4.3.

Uninsured, i.e. Mortar with less than above specification
Sieve number Percentage of sand retained (by weight)
. Joints > 6.25mm Joints < or = 6.25 mm
. Max Min Max Min
4 (4.76 mm) 0 0 0 0
8 (2.38 mm) 10 0 0 0
16 ( 1.19 mm) 40 15 15 5
30 ( 595 microns) 65 35 60 40
50 (297 microns) 85 75 85 75
100 (149 microns) 98 95 99 95